Highlight Drill Results:

GS2508

1.05 g/t Au over 120.7 m in the Cleary Zone

GS2528

1.78 g/t Au over 61 m in the Cleary Zone

GS2531

1.53 g/t Au over 191.3 m in the Dolphin Zone

Note: The reported widths refer to drill hole intercepts; true width cannot be determined due to the uncertain geometry of mineralization.

VANCOUVER, BC, Dec. 4, 2025 /CNW/ – Freegold Ventures Limited (TSX: FVL,OTC:FGOVF) (OTCQX: FGOVF) announces results from six additional drill holes at the Golden Summit project. In 2025, a total of 62 holes were drilled, with assay results for 29 holes reported to date. Reporting assay results will continue in the coming months. The results from the 2025 and first half of 2026 drilling programs will be used to update the mineral resource estimate (MRE) published in July 2025, which reported 17.2 million ounces at 1.24 g/t Au indicated and 11.9 million ounces at 1.04 g/t Au inferred. The updated MRE and subsequent drilling in 2026 will serve as the basis for the Pre-Feasibility Study (PFS), scheduled for completion in early 2027. In addition to the extensive drill program, a range of other activities supporting the PFS are in progress. These include cultural resource assessments, paleontology, groundwater studies, power supply analysis, mammal habitat evaluations, and continuing metallurgical test work.

2025 Program Overview
The 2025 drilling program has been highly successful, focusing on the Cleary, Dolphin, and WOW zones. Efforts have centered on infill drilling to support the PFS, refining both geological and resource models, and developing a conceptual higher-grade starter pit targeting 5-10 million ounces to enhance the project’s early economic potential. Mineralization remains open both to the east and west of the current deposit.

Kristina Walcott, President and CEO of Freegold, commented, ‘The potential scale of this deposit is truly amazing. Our current exploration efforts focused on defining an area to host an attractive potential starter pit, as we continue to move the project forward through PFS’.  Further infill drilling in early 2026 is expected to refine this area further.

Metallurgical Test Work
Metallurgical testing continues to evaluate the most viable process flowsheets for Golden Summit material. Gold recovery rates exceeding 90% have been achieved using a flowsheet that includes gravity concentration, flotation to produce a cleaner concentrate, and subsequent treatment with sulphide-oxidizing techniques such as BIOX®, POX, and the Albion Process, producing feed for carbon-in-leach (CIL) for additional gold recovery.  Simple gravity and CIL are also being evaluated. This testwork is crucial to maximize the resource’s potential and will underpin the many trade-off scenarios to be evaluated during the Pre-Feasibility stage.

Current Drilling Status
Five drill rigs are currently completing the final holes of the season. Drilling will gradually wind down for a seasonal break and resume in February 2026.

Dolphin Zone: Higher-Grade Potential
Recent drilling in the Dolphin zone confirms strong, continuous mineralization, with broad intercepts of higher grades. The near-surface intercept in GS2531 indicates promising potential for higher grades, supporting the concept of a potential higher-grade starter area.

At depth, hole GS2531 shows excellent correlation with the current model, with an intercept of 1.53 g/t Au over 191.3m within the modelled higher-grade schist domain. This corridor remains open to the southwest and extends into the intrusive domain at depth. Hole GS2542, drilled 200 m south of GS2531, aims to extend the zone downdip, with assays pending.  Several other holes are planned for this potential higher-grade domain in 2026, as it may serve as the economic keel for a potential starter pit.

Hole

Depth (m)

Dip (°)

Azimuth (°)

From (m)

To (m)

Interval (m)

Au (g/t)

GS2515

602.5

-80

360

84.4

99.7

15.3

3.00

142.3

147.5

5.2

0.81

175.3

181.7

6.4

13.53

227.9

232.8

4.9

3.06

303.9

313.0

9.1

1.71

396.2

416.6

20.4

0.79

GS2531

703.2

-90

360

35.6

38.7

3.1

9.33

53.9

62.7

8.8

2.05

81.4

83.8

2.4

9.51

102.4

143.5

41.1

1.06

330.3

361.5

31.2

0.87

386.2

577.5

191.3

1.53

Note: The reported widths refer to drill hole intercepts; true width cannot be determined due to the uncertain geometry of mineralization.

GS2515, drilled in the northern Dolphin Zone, intersected higher-grade mineralization with 3.0 g/t Au over 15.3m from 84.4 m, 13.53 g/t over 6.4m from 175.3m, and 3.06 g/t Au over 4.9m from 227.9 m. Like GS2531, located 250m to the south, GS2515’s higher-grade, closer-to-surface intercepts provide further encouragement for the development of a potential starter pit. Planned shallow infill drilling in 2026 will further target these areas.

Cleary Zone: Drilling Results Continuing to demonstrate strong correlation with resource model
Infill drilling within the Cleary Zone continues to demonstrate a strong correlation with the current resource model. Hole GS2508 returned 1.05 g/t Au over 120.7m, while hole GS2528 encountered four intervals with higher grades and widths, notably 1.6 g/t Au over 57.9m and 1.78 g/t Au over 61m, as well as two narrower, higher-grade sections. Hole GS2517, designated for hydrological investigation targeted the potential higher-grade downdip extent, was abandoned due to challenging ground conditions and complications arising from the attempted installation of a vibrating Wire Piezometer (VWP). VPWs are being installed to monitor groundwater levels throughout the prospective pit area, capturing both vertical and horizontal gradients to inform analyses of possible fault-block compartmentalization and support ongoing groundwater monitoring efforts. Eight installations were completed during 2025. A follow-up vertical hole, GS2549, was drilled from the same collar as GS2517 to access the target zone; assay results are pending.

Hole

Depth (m)

Dip (°)

Azimuth (°)

From (m)

To (m)

Interval (m)

Au (g/t)

GS2508

502

-75

360

224.6

345.3

120.7

1.05

364.8

373.7

8.9

0.91

GS2517*

593.4

-75

360

477.6

546.5

68.9

0.64

GS2524

413.3

-90

0

17.4

23.5

6.1

1.34

141.7

148.4

6.7

1.12

203.3

209.4

6.1

3.36

GS2528

721.2

-90

0

86.0

102.7

16.7

0.98

325.2

328.3

3.1

35.09

416.7

474.6

57.9

1.60

514.2

544.1

29.9

0.70

559.9

620.9

61.0

1.78

670.6

672.7

2.1

35.65

Note: The reported widths refer to drill hole intercepts; true width cannot be determined due to the uncertain geometry of mineralization. *Hole GS2517 was drilled for both infill and hydrogeological purposes.

Metallurgical Update: Environmental Characterization – Non-Acid-Generating Tailings
Recent metallurgical work results have also shown more positive developments. Tailings from the locked-cycle flotation tests were analyzed for environmental characterization, including Acid Base Accounting (ABA) and Toxicity Characteristic Leaching Procedures (TCLP). Tailings from the flotation-based flowsheet have been classified as low risk for acid generation due to the removal of sulphur and the presence of significant amounts of calcium carbonate. Gravity tailings from the CIL leach scenario also showed arsenic levels below acceptable limits. More specifically, results showed the Neutralization Potential to Acid Generating Potential ratio (NPR) of the flotation tailings was significantly above what is typically classified as non-acid generating.

About Golden Summit
Since 2020, the Golden Summit project has emerged as one of North America’s largest undeveloped gold resources. The increase in resource ounces and grade is attributed to targeted drilling campaigns (over 130,000 metres from 2020 to 2024), improvements to geological models, and a better understanding of mineralization controls. Positive metallurgical test results have further advanced the project. Ongoing drilling continues to delineate zones of higher-grade mineralization, converting previously considered waste areas into potentially economically viable zones.  Continued westward expansion has led to the discovery of new, higher-grade zones.

As of July 2025, the Golden Summit resource includes an Indicated Primary Mineral Resource of 17.2 million ounces at 1.24 g/t Au and an Inferred Primary Mineral Resource of 11.9 million ounces at 1.04 g/t Au, calculated using a 0.5 g/t cut-off grade and a three-year trailing average gold price of $2,490.

Drilling will continue into 2026, with upcoming results expected to support an updated resource estimate. A significant number of assay results remain pending.

Links to the Plan Map and Section 470505E

https://freegoldventures.com/site/assets/files/6287/nr-2025-drilling-20251204.jpeg

https://freegoldventures.com/site/assets/files/6287/e479050_section_04122025.pdf

QA/QC
HQ Core is logged, photographed and cut in half using a diamond saw. One half is placed in sealed bags for preparation and subsequent geochemical analysis by MSA Laboratories in Fairbanks, Alaska or ALS’s facilities in Vancouver and Thunder Bay.  At MSALABS, the entire sample will be dried and crushed to 70% passing -2mm (CRU-CPA). A ~500g riffle split was analyzed for gold using CHRYSOS PhotonAssay (CPA-Au1). From this, 250g will be further riffle-split from the original PhotonAssay sample, pulverized, and a 0.25g sub-sample analyzed for multi-element geochemistry using MSA’s IMS230 package, which includes 4-acid digestion and ICP-MS finish. MSALABS operates under ISO/IEC 17025- and ISO 9001-certified quality systems.

Core samples were delivered to ALS’s facility in Vancouver, Canada, where each sample was crushed to 70% passing a 2 mm (Tyler 9 mesh, U.S. Std. No. 10) screen.  A representative ~500 g subsample was obtained by riffle splitting (SPL-32a) and analyzed for gold using the ALS method Au-PA01 (Photon Assay), which provides a detection range of 0.03 to 350 ppm, in Thunder Bay.

In addition, a subsample was analyzed for multi-element geochemistry using the ALS method ME-ICP61 (34-element, four-acid ICP-AES).

A QA/QC program includes laboratory and field standards inserted in every ten samples. Blanks are inserted at the start of the submittal, and at least one blank every 25 standards.

The Qualified Person for this release is Alvin Jackson, P.Geo., Vice President of Exploration and Development for Freegold, who has approved the scientific and technical disclosure in this news release.

About Freegold Ventures Limited
Freegold is a TSX-listed company focused on exploration in Alaska.

Some statements in this news release contain forward-looking information, including, without limitation, statements as to planned expenditures and exploration programs, potential mineralization and resources, exploration results, the completion of an updated NI 43-101 technical report, and any other future plans. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance, or achievements expressed or implied by the statements. Such factors include, without limitation, the completion of planned expenditures, the ability to complete exploration programs on schedule, and the success of exploration programs. See Freegold’s Annual Information Form for the year ended December 31st, 2024, filed under Freegold’s profile at www.sedar.com, for a detailed discussion of the risk factors associated with Freegold’s operations.

SOURCE Freegold Ventures Limited

View original content to download multimedia: http://www.newswire.ca/en/releases/archive/December2025/04/c4300.html

News Provided by Canada Newswire via QuoteMedia

This post appeared first on investingnews.com

MILAN — The Prada Group announced Tuesday that it has officially purchased Milan fashion rival Versace in a 1.25 billion euro (nearly $1.4 billion) deal that puts the fashion house known for its sexy silhouettes under the same roof as Prada’s “ugly chic” aesthetic and Miu Miu’s youth-driven appeal.

The highly anticipated deal is expected to relaunch Versace’s fortunes, after middling post-pandemic performance as part of the U.S. luxury group Capri Holdings.

Prada said in a one-line statement that the acquisition had been completed after receiving all regulatory clearances.

Prada heir Lorenzo Bertelli will steer Versace’s next phase as executive chairman, in addition to his roles as group marketing director and sustainability chief.

The son of co-creative director Miuccia Prada and longtime Prada Group chairman Patrizio Bertelli has said he doesn’t expect to make any swift executive changes at Versace. But Bertelli has said that the company, which places among the top 10 most recognized brands in the world, has long been underperforming in the market.

Prada has underlined that the 47-year-old Versace brand offered “significant untapped growth potential.’’

Versace has been in the midst of a creative relaunch under a new designer, Dario Vitale, who previewed his first collection during Milan Fashion Week in September. He had previously been head of design at Miu Miu, but his move to Versace was unrelated to the Prada deal, executives have said.

Capri Holdings, which owns Michael Kors and Jimmy Choo, paid $2 billion for Versace in 2018, but had been struggling to position Versace’s bold profile in the recent era of “quiet luxury.″

Versace represented 20% of Capri Holdings 2024 revenue of 5.2 billion euros. An analyst presentation for the Prada deal said that Versace would represent 13% of the Prada Group’s pro-forma revenues, with Miu Miu coming in at 22% and Prada at 64%. The Prada Group, which also includes Church’s footwear, reported a 17% boost in revenues to 5.4 billion euros last year.

The Prada Group has already begun preparations to incorporate crosstown rival Versace into its Italian manufacturing system, a point of pride for the group.

“Making a bag for one brand or another, the know-how is the same,″ Bertelli told reporters last week at the group’s Scandicci leather goods factory, which already makes bags for the Prada and Miu Miu brands and will soon add Versace.

The Prada Group’s has invested 60 million euros in its supply chain this year, including a new leather goods factory near Siena, a new knitwear factory near Perugia as well as increasing production at its factory Church’s footwear factory in Britain and expanding another Tuscan factory. That’s on top of 200 million euros in investments from 2019-24.

Prada’s efforts include an academy that has trained some 570 new artisans over the last 25 years in an in-house training academy operating in the Tuscany, Marche, Veneto and Umbria regions.

Last year, Prada hired 70% of the 120 artisans who trained in the academy. The number of trainees rose by 28% to 152 this year.

This post appeared first on NBC NEWS

Outages on Shopify’s e-commerce platform have been resolved, the company said late Monday, bringing to an end a daylong glitch on the annual ‘Cyber Monday’ shopping day.

Some merchants that use Shopify’s service to sell goods online said they experienced issues with checkouts through the company’s point-of-sale system.

Businesses that run on Shopify also had trouble logging into their administrative portals.

In a statement, Shopify said: ‘We had a system degradation that has now been mitigated.’

Throughout the day, business owners posted angry messages directed at the company on X, where Shopify President Harvey Finkelstein had posted ‘HAPPY CYBER MONDAY! Let’s finish strong!’ earlier in the day, with an emoji of a flexed arm.

One business, Costack Spices, based in London, replied: ‘How??? [We] cannot fulfill orders or log on,’ with three red-faced emojis. In a follow-up, the company posted, ‘This is unbelievable.’

Another user wrote, ‘@ShopifySupport I haven’t been able to access it for the last couple hours.’

Shopify replied to most users on X with the same message: ‘We are aware of an issue with Admins impacting selected stores, and are working to resolve it.’

In 2024, merchants using Shopify services recorded $11.5 billion in sales from Black Friday through Cyber Monday, the company said, with more than 76 million customers buying from businesses powered by the platform.

Shopify provides website design tools, online checkout services and digital advertising products to businesses of all sizes. The company says that millions of merchants use its services.

While Shopify’s share of Cyber Monday sales may be limited, smaller businesses that rely on the company to process their transactions may have missed out on crucial sales at the start of the all-important holiday season.

Total Cyber Monday sales are expected to be more than $53 billion, according to Salesforce.

Shopify stock ended the trading day down 5.9%.

This post appeared first on NBC NEWS

(TheNewswire)

Additional Financing Closes

NOT FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

Vancouver, British Columbia TheNewswire – December 3rd, 2025 Prismo Metals Inc. (‘ Prismo ‘ or the ‘ Company ‘) (CSE: PRIZ,OTC:PMOMF) (OTCQB: PMOMF) is pleased to announce it has received assay results for samples recently taken at the Silver King Project from two exploration targets located on the east side of the property, namely the Black Diamond replacement target and the newly named Crown porphyry intrusion target (Fig. 1).

Figure 1 .  Map showing the location of the Black Diamond replacement and Crown porphyry intrusion exploration targets at the Silver King project.  Claim boundaries are shown in yellow.

The assays show high grade copper mineralization present at Black Diamond (Fig 1). The rock chip samples yielded generally high copper assays with several samples analyzing in excess of 1 % Cu and two samples in excess of 5 % Cu (Table 1, Fig. 2).  Gold is generally anomalous for the Black Diamond samples.

Rock chip samples from the Crown porphyry intrusion generally exhibited lead and zinc values with elevated silver and low copper and gold (Table 2).  Importantly, however, two samples of vein material from the stockwork target yielded high gold values of 4 and 5 g/t (Fig. 2). The mineralization in the stockwork veining at Crown provides impetus to complete additional exploration in the area.

Table 1. Assay results for samples from the Black Diamond replacement target.

Sample

Location

Easting

Northing

Width m

Au g/t

Ag g/t

Cu %

Pb %

Zn %

544572

Black Diamond

492601

3687624

1.5

0.007

0.30

0.18

0.009

0.02

544573

Black Diamond

492601

3687625

1.5

0.052

0.34

0.29

0.013

0.03

544574

Black Diamond

492603

3687623

1.5

0.008

0.47

0.12

0.009

0.02

544575

Historic adit 3

492642

3687624

0.5

1.08

0.15

5.56

0.013

0.03

544576

Historic adit 3

492641

3687625

0.5

0.045

1.08

0.44

0.022

0.02

544577

Historic adit 3

492643

3687621

1.0

0.012

0.76

0.07

0.014

0.02

544578

Historic adit 1

492670

3687639

0.8

0.285

12.43

6.02

0.01

544581

Historic adit 1

492672

3687640

1.1

0.125

10.5

1.14

0.011

0.02

544582

Historic adit 1

492667

3687640

1.4

0.285

6.66

2.63

0.006

0.02

544583

Black Diamond

492678

3687626

0.5

0.034

2.18

0.15

0.009

0.02

544584

Historic adit 2

492670

3687625

0.5

0.35

7.99

1.24

0.006

0.01

544585

Historic adit 2

492679

3687628

0.5

0.125

8.87

0.45

0.013

0.02

544586

Historic adit 2

492672

3687638

1.0

0.053

8.97

1.42

0.013

0.02

Table 2 . Assay results for samples from the Crown porphyry intrusive target.

Sample

Location

Easting

Northing

Width m

Au g/t

Ag g/t

Cu %

Pb %

Zn %

544566

Crown

492633

3687859

1.5

0.008

3.7

0.005

0.03

0.04

544567

Crown

492805

3687910

1.3

0.011

1.3

0.006

0.01

544568

Crown

492803

3687910

2.0

0.006

1.28

0.008

0.03

0.03

544569

Crown

492836

3687898

1.0

0.012

0.25

0.008

544570

Crown

492499

3687669

1.0

0.011

2.31

0.035

0.07

0.09

544571

Crown

492534

3687657

0.5

0.016

2.65

0.002

0.09

0.03

544588

Crown

492737

3687901

2.5

0.015

2.76

0.005

0.01

0.01

544589

Crown

492746

3687884

1.0

0.022

4.21

0.010

0.03

0.02

544590

Crown

492763

3687867

0.5

0.07

11.26

0.013

0.05

0.11

544591

Crown

492799

3687851

1.0

5.19

46.44

0.048

0.21

0.06

544592

Crown

492793

3687823

1.0

4.06

13.97

0.021

0.10

0.07

544593

Crown

492701

3687858

1.5

0.027

1.0

0.011

0.03

0.04


Click Image To View Full Size

Figure 2. Copper assays and high gold values for samples mentioned from the Black Diamond
and Crown areas at Silver King.

IP Survey Update

The Company also has received the report for initial phase of its IP survey at Silver King.  The IP survey consisted of a gradient array to test for resistivity and chargeability anomalies at a depth of about 300m below the surface.

The IP survey shows low resistivity lows associated with the Black Diamond replacement body as well as the stratigraphically controlled Cu bearing replacements that extend toward the nearby Magma mine (Fig. 3).  A second nearly east-west trending resistivity low occurs in the central portion of the claim block and coincides with a hypothesized structure that may control the Black Diamond body and also may be important in the formation of the Silver King deposit.  This type of structure is similar to the Magma vein, the main mineralized structure at the high-grade Magma mine, and is a prime exploration target.

The IP survey also shows several chargeability anomalies that are presumably associated with disseminated sulfides, largely pyrite (Fig. 4).  The stockwork intrusion mentioned previously is associated with one of these chargeability anomalies and provides a second important exploration target with characteristics similar to mineralization at high structural levels in porphyry systems.  A second similar chargeability anomaly occurs nearby to the southwest in an area overlain by a mostly barren quartz diorite intrusive and may represent a similar blind porphyry target.

Based on the results of the initial IP survey, a follow-up pole-dipole survey to further define the anomalies from shallow to deeper levels along section lines is planned to be conducted in December.

Figure 3. IP resistivity map showing exploration targets: yellow line-Silver King glory hole,
magenta line-polymetallic vein, green line-copper vein, red outlines-Black Diamond replacement
body and stratigraphically controlled replacement horizons, black outline-stockwork intrusion.

Figure 4. IP chargeability map showing exploration targets: yellow line-Silver King glory hole,
magenta line-polymetallic vein, green line-copper vein, red outlines-Black Diamond replacement
body and stratigraphically controlled replacement horizons, black outline-stockwork intrusion.

Drilling Update

Alain Lambert, CEO of Prismo commented: ‘The results announced today confirm the vast exploration potential at Silver King. While we look forward to drilling these new targets in the future, our plans remain unchanged. Our immediate priority is to undertake our fully funded drill program, as previously announced. This drill campaign will focus primarily on the historic Silver King mine site and will be for a minimum of about 1,000 meters. The objective is to test the upper half of the steeply dipping pipelike Silver King mineralized body as well as potential mineralization adjacent to the dense stockwork that was the focus of historic mining.’

Mr. Lambert added: ‘We are pleased with the steady progress on the permitting front. The collaboration of Forest Service officials demonstrates a clear commitment to supporting mining activities in Arizona.’

Prismo recently announced that the Forest Service, the federal surface land management entity for Silver King, had determined that the Company’s proposed drill plan meets the regulatory requirements for processing, and that such plan is complete, as described in the regulations at 36 CFR 228.4(c).

The Forest Service will now proceed with the environmental analysis pursuant to 36 CFR 228(a)(5) in conformity with the National Environmental Policy Act (NEPA). This analysis will proceed as a Categorical Exclusion, the lowest level of environment reviews applicable to projects that are not expected to have a significant effect on the environment, such as Silver King.

Financing Update

Prismo also announced that further to its news releases dated October 20, 2025 and November 13, 2025, the Company has proceeded with an upsized second closing of its previously announced non-brokered private placement of units of the Company (‘ Units ‘) at an issue price of $0.10 per Unit (the ‘ Private Placement ‘). The second closing of the Private Placement was increased from 1,250,000 Units to the issuance of 1,650,000 Units for gross proceeds of $165,000 (the ‘ Second Tranche ‘). The Company previously announced a first closing of the Private Placement on November 12, 2025 for aggregate gross proceeds of $1,745,000. Due to strong investor demand, the Company has now raised aggregate gross proceeds of $1,910,000.

Each Unit consists of one common share in the capital of the Company (a ‘ Share ‘) and one common share purchase warrant of the Company (a ‘ Warrant ‘). Each Warrant entitles the holder to purchase one Share for a period of thirty-six (36) months from the date of issue at an exercise price of $0.175.

The Company intends to use the net proceeds of the Private Placement primarily for drilling at its Silver King project and for general corporate purposes. The Company expects to accept additional subscriptions of units in the coming days for an approximate amount of $125,000.

The Units issued pursuant to the Second Tranche are subject to a four-month hold period from the closing date of the Second Tranche under applicable Canadian securities laws, in addition to such other restrictions as may apply under applicable securities laws of jurisdictions outside Canada.

In connection with the Second Tranche, the Company issued an aggregate of 68,000 finder’s warrants (the ‘Finder’s Warrants’ ) and paid finder’s commissions of $6,800 to a certain qualified finder. Each Finder’s Warrant is exercisable for a period of twenty-four (24) months from the date of issuance to purchase one Share at a price of $0.10. In addition, the Company paid a cash fee of $2,000 to a financial advisor.

The securities being issued in connection with the Second Tranche have not been and will not be registered under the U.S. Securities Act and may not be offered or sold in the United States, or to, or for the account or benefit of, U.S. persons or persons in the United States, absent registration or an applicable exemption from the registration requirements. This press release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any State in which such offer, solicitation or sale would be unlawful.

QA/QC

Samples were analyzed by SGS, an internationally recognized analytical lab, with preparation at the Tempe, Arizona facility and analyses at the Burnaby laboratory.  Prismo inserts controls samples consisting of a standard pulps and a coarse blanks in the sample stream, and the lab also inserts control samples.

Qualified Person

Dr. Craig Gibson, PhD., CPG., a Qualified Person as defined by NI-43-01 regulations and Chief Exploration Officer and a director of the Company, has reviewed and approved the technical disclosures in this news release.

About Prismo Metals Inc.

Prismo (CSE: PRIZ,OTC:PMOMF) is a mining exploration company focused on advancing its Silver King, Ripsey and Hot Breccia projects in Arizona and its Palos Verdes silver project in Mexico.

Please follow @PrismoMetals on Twitter , Facebook , LinkedIn , Instagram , and YouTube

Prismo Metals Inc.

1100 – 1111 Melville St., Vancouver, British Columbia V6E 3V6 Phone: (416) 361-0737

Contact:

Alain Lambert, Chief Executive Officer alain.lambert@prismometals.com

Gordon Aldcorn, President gordon.aldcorn@prismometals.com

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as intends’ or anticipates’, or variations of such words and phrases or statements that certain actions, events or results may’, could’, should’, would’ or occur’. This information and these statements, referred to herein as ‘forward-looking statements’, are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management’s expectations and intentions with respect to, among other things: the timing, costs and results of drilling at Silver King; and the intended use of any proceeds raised under the Second Tranche.

These forward-looking statements involve numerous risks and uncertainties, and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things: the potential inability of the Company to utilize the anticipated proceeds of the Private Placement as anticipated; and those risks set out in the Company’s public disclosure record on SEDAR+ ( www.sedarplus.com ) under the Company’s issuer profile .

In making the forward-looking statements in this news release, the Company has applied several material assumptions, including without limitation, that the Company will use the proceeds of the Second Tranche as currently anticipated and on the timeline currently expected.

Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward- looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward- looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial outlook that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.

Copyright (c) 2025 TheNewswire – All rights reserved.

News Provided by TheNewsWire via QuoteMedia

This post appeared first on investingnews.com

NOT FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES
OR FOR DISSEMINATION IN THE UNITED STATES

Osisko Metals Incorporated (the ‘ Company ‘ or ‘ Osisko Metals ‘) (TSX: OM,OTC:OMZNF; OTCQX: OMZNF; FRANKFURT: OB51) is pleased to announce that it expects to complete a non-brokered private placement with certain strategic investors for an aggregate of approximately 67,666,666 common shares of the Company (the ‘ Common Shares ‘) at an offering price of $0.48 per Common Share for aggregate gross proceeds to the Company of approximately $32,480,000 (the ‘ Private Placement ‘).

The Private Placement is expected to include subscriptions from certain strategic investors, including:

  • Hudbay Minerals Inc. : 29,166,666 Common Shares for gross proceeds of $14,000,000;
  • Agnico Eagle Mines Limited : has indicated that it intends to subscribe for 26,000,000 Common Shares for gross proceeds of $12,480,000 pursuant to an existing participation right;
  • Franco-Nevada Corporation : 4,166,667 Common Shares for gross proceeds of $2,000,000; and
  • A strategic institutional investor : 8,333,333 Common Shares for gross proceeds of $4,000,000.

The size of the Private Placement will depend on, among other things, certain contractual participation rights granted by the Company to Glencore Canada Corporation (the ‘ Glencore Participation Right ‘).

Osisko Metals CEO Robert Wares commented: We are pleased to welcome Hudbay Minerals as a new significant shareholder of Osisko Metals. We also appreciate the continued participation of Agnico Eagle and two of our existing principal and strategic shareholders. We view the participation in the private placement by these investors as support for the potential of the Gaspé Copper project and we look forward to continued support from these shareholders as we advance our project.

After giving effect to the Private Placement, but before giving effect to any other issuance of Common Shares (including pursuant to the Glencore Participation Right): (i) Hudbay Minerals Inc. (‘ Hudbay ‘) is expected to beneficially own or control 29,166,666 Common Shares, representing approximately 4.3% of the issued and outstanding Common Shares, calculated on a non-diluted basis; and (ii) Agnico Eagle Mines Limited (‘ Agnico ‘) is expected to beneficially own or control 87,815,000 Common Shares, representing an ownership interest in the Company equal to approximately 12.5% (calculated on a partially-diluted basis). As part of the Private Placement, the Company and Hudbay have agreed to enter into an investor rights agreement, pursuant to which Hudbay will be granted certain rights, including top-up rights and the right to participate in future offerings of securities of the Company upon Hudbay’s ownership interest increasing to 9.9% and, subject to certain minimum ownership thresholds and other conditions, the right to board representation.

The net proceeds of the Private Placement are expected to be used to advance the Company’s Gaspé Copper project (including drilling, permitting and technical studies) and for general corporate purposes. The Private Placement is expected to close on or about December 16, 2025, subject to the negotiation and execution of definitive agreements and the satisfaction of certain customary closing conditions therein, including the conditional approval of the Toronto Stock Exchange (the ‘ TSX ‘).

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the U.S. Securities Act, or any state securities laws and may not be offered or sold within the United States or to or for the account or benefit of a U.S. person (as defined in Regulation S under the U.S. Securities Act) unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

About Osisko Metals

Osisko Metals Incorporated is a Canadian exploration and development company creating value in the critical metals sector, with a focus on copper and zinc. The Company acquired a 100% interest in its flagship project, the past-producing Gaspé Copper mine, from Glencore Canada Corporation in July 2023. The Gaspé Copper project is located near Murdochville in Québec’s Gaspé Peninsula. The Company is currently focused on resource expansion of the Gaspé Copper system, with current Indicated Mineral Resources of 824 Mt grading 0.34% CuEq and Inferred Mineral Resources of 670 Mt grading 0.38% CuEq (in compliance with NI 43-101). For more information, see Osisko Metals’ November 14, 2024 news release entitled ‘ Osisko Metals Announces Significant Increase in Mineral Resource at Gaspé Copper ‘. Gaspé Copper hosts the largest undeveloped copper resource in eastern North America, strategically located near existing infrastructure in the mining-friendly province of Québec.

In addition to the Gaspé Copper project, the Company is working with Appian Capital Advisory LLP, through the Pine Point Mining Limited joint venture, to advance one of Canada’s largest past-producing zinc mining camps, the Pine Point project, located in the Northwest Territories. The current mineral resource estimate for the Pine Point project consists of Indicated Mineral Resources of 49.5 Mt at 5.52% ZnEq and Inferred Mineral Resources of 8.3 Mt at 5.64% ZnEq (in compliance with NI 43-101). For more information, see Osisko Metals’ June 25, 2024 news release entitled ‘Osisko Metals releases Pine Point mineral resource estimate: 49.5 million tonnes of indicated resources at 5.52% ZnEq’ . The Pine Point project is located on the south shore of Great Slave Lake, Northwest Territories, close to infrastructure, with paved road access, an electrical substation and 100 kilometers of viable haul roads.

For further information on this news release, visit www.osiskometals.com or contact:

Don Njegovan, President
Email: info@osiskometals.com
Phone: (416) 500-4129

Cautionary Statement on Forward-Looking Information

This news release contains ‘forward-looking information’ within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans projections, objectives, assumptions, future events or performance (often, but not always, using phrases such as ‘expects’ or ‘does not expect’, ‘is expected’, ‘interpreted’, ‘management’s view’, ‘anticipates’ or ‘does not anticipate’, ‘plans’, ‘budget’, ‘scheduled’, ‘forecasts’, ‘estimates’, ‘potential’, ‘feasibility’, ‘believes’ or ‘intends’ or variations of such words and phrases or stating that certain actions, events or results ‘may’ or ‘could’, ‘would’, ‘might’ or ‘will’ be taken, occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This news release contains forward-looking information pertaining to, among other things: the ability for the Company to complete the Private Placement on the terms contemplated (if at all); the size of the Private Placement; the expected ownership interest of certain participants in the Private Placement; the negotiation and execution of definitive agreements in connection with the Private Placement; the exercise of the participation rights by Agnico and Glencore Canada Corporation; the closing date of the Private Placement; the ability for the Company to obtain the conditional and final approval of the TSX; the anticipated use of proceeds of the Private Placement; the ability for the Company to unlock the full potential of its assets and achieve success; the ability for the Company to create value for its shareholders; the advancement of the Pine Point project; the anticipated resource expansion of the Gaspé Copper system; and Gaspé Copper hosting the largest undeveloped copper resource in eastern North America.

Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management, in light of management’s experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, including, without limitation, assumptions about: the ability of exploration results, including drilling, to accurately predict mineralization; errors in geological modelling; insufficient data; equity and debt capital markets; future spot prices of copper and zinc; the timing and results of exploration and drilling programs; the accuracy of mineral resource estimates; production costs; political and regulatory stability; the receipt of governmental and third party approvals; licenses and permits being received on favourable terms; sustained labour stability; stability in financial and capital markets; and availability of mining equipment and positive relations with local communities and groups. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information are set out in the Company’s public disclosure record on SEDAR+ ( www.sedarplus.ca ) under Osisko Metals’ issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

News Provided by GlobeNewswire via QuoteMedia

This post appeared first on investingnews.com

Group Eleven Resources Corp. (TSXV: ZNG,OTC:GRLVF) (OTCQB: GRLVF) (FSE: 3GE) (‘Group Eleven’ or the ‘Company’) is pleased to announce the latest two step-out drill holes from its Ballywire discovery (‘Ballywire’) at the 100%-owned PG West Project (‘PG West’), Republic of Ireland.

Highlights:

  • 25-3552-47 (approx. 100m step-out SSE of 25-3552-40, initial test of the Deeper Cu-Ag target; announced 22-Sep-25) intersected four zones of mineralization, including:
    • New Mineralized Zone (South) – Waulsortian Hosted (starting from 313.1m downhole)
    • 20.3m of 2.6% Zn+Pb (1.5% Zn and 1.1% Pb), 6 g/t Ag, including
    • 7.3m of 5.2% Zn+Pb (2.5% Zn and 2.7% Pb), 10 g/t Ag, including
    • 3.8m of 7.3% Zn+Pb (3.7% Zn and 3.6% Pb), 14 g/t Ag, including
    • 1.9m of 10.7% Zn+Pb (5.7% Zn and 5.0% Pb), 19 g/t Ag
    • New Mineralized Zone (South) – Base of Waulsortian (starting from 355.9m downhole)
    • 2.6m of 2.7% Zn+Pb (0.1% Zn and 2.5% Pb) and 19 g/t Ag, including
    • 0.8m of 6.7% Zn+Pb (0.3% Zn and 6.5% Pb) and 37 g/t Ag
    • Deeper Cu-Ag Zone (starting from 490.7m downhole)
    • 11.3m of 0.26% Cu and 8 g/t Ag, including
    • 4.7m of 0.46% Cu and 14 g/t Ag, including
    • 1.8m of 0.83% Cu and 24 g/t Ag
    • Deeper Cu-Ag Zone (starting from 616.6m downhole)
    • 9.4m of 0.25% Cu and 7 g/t Ag, including
    • 3.7m of 0.32% Cu and 8 g/t Ag, including
    • 0.8m of 0.62% Cu and 16 g/t Ag

‘Today’s results represent a positive surprise given we were not expecting robust Zn-Pb-Ag mineralization south of the main discovery trend at this particular location,’ stated Bart Jaworski, CEO. ‘In addition to successfully extending significant Deeper Cu-Ag mineralization down dip by over 200m from previous drilling, today’s hole intersected strong Zn-Pb-Ag mineralization in a new part of the discovery. Long theorized, new zones of mineralization parallel to the main discovery trend at Ballywire were evidenced this September by hole 25-3552-44 which discovered a new Cu-Ag bearing feeder structure to the north of the main discovery. Today’s results show a similar situation, but to the south, enhancing the potential for at least two additional mineralized zones. If borne out, this greatly expands Ballywire’s tonnage potential.’

‘Driven by new zones of mineralization, growing momentum at our Deeper Cu-Ag zone and the fact that the majority of our 6km long prospective trend is yet to be drilled, Ballywire’s exploration upside continues to ramp up. With a robust treasury and our most ambitious drilling campaign to date – four rigs turning in Ireland – we are poised to continue unlocking Ballywire’s full potential over the coming months.’

Exhibit 1. Cross-Section Showing 25-3552-47 Testing Deeper Cu-Ag Zone at Ballywire.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5685/276566_d7aa5ace04d3b85a_002full.jpg

Note: True thickness of the mineralized intervals in hole 25-3552-47 as a percentage of the down-hole interval, is estimated to be approx. 90-100% for Waulsortian-hosted zones, and 60-80% for sub-Waulsortian zones.

Exhibit 2. Plan Map of Main Ballywire Discovery Corridor, Showing New Holes 25-3552-45 and -47.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5685/276566_d7aa5ace04d3b85a_003full.jpg

Note: ‘New Min’zd Zone (S)’ means New Mineralized Zone (South); ‘Potential Zone (N)’ means Potential Mineralized Zone (North).

Exhibit 3. Cross-Section of 25-3552-45 (and Previously Reported Holes -35 and -39).

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5685/276566_d7aa5ace04d3b85a_004full.jpg

Note: True thickness of the mineralized intervals in hole 25-3552-45 as a percentage of the down-hole interval, is estimated to be approx. 80-100%.

Ballywire Drill Update

The Ballywire prospect at the Company’s 100%-owned PG West Project in Republic of Ireland, represents the most significant mineral discovery in Ireland in over a decade. First announced in Sept-2022, the discovery has 64 holes drilled and reported by Group Eleven to date, including the most recent two holes (25-3552-45 and -47) reported today (see Exhibits 1 to 6).

Assays from today’s drill holes are summarized above and below (and in Exhibits 4 and 5). Mineralization consists predominantly of sphalerite, galena and pyrite, with the Cu-Ag bearing zones also containing chalcopyrite and suspected tennantite-tetrahedrite.

In addition to results from 25-3552-47, described above, hole 25-3552-45 intersected two zones of significant mineralization along a fault structure (see Exhibits 3 and 5). Strong exploration upside remains further to the NNW and SSE along this section.

Exhibit 4. Summary of Assays from 25-3552-47 at Ballywire

Item From
(m)
To
(m)
Int
(m)
Zn
(%)
Pb
(%)
Zn+Pb
(%)
Ag
(g/t)
Cu
(%)
25-3552-47 313.14 333.42 20.28 1.49 1.14 2.63 5.7
Incl. 313.14 319.60 6.46 1.45 0.47 1.92 5.2
And 326.11 333.42 7.31 2.51 2.65 5.16 10.1
Incl. 329.63 333.42 3.79 3.71 3.60 7.31 13.7 0.01
Incl. 330.59 332.52 1.93 5.73 5.01 10.75 18.7 0.01
Incl. 330.59 331.56 0.97 6.45 5.39 11.84 18.7 0.01
And 355.85 358.45 2.60 0.13 2.54 2.67 18.8 0.04
Incl. 356.73 357.56 0.83 0.28 6.46 6.74 36.7 0.08
And 490.74 502.02 11.28 0.01 0.01 0.02 7.5 0.26
Incl. 494.50 502.02 7.52 0.01 0.01 0.03 10.5 0.35
Incl. 497.32 502.02 4.70 0.02 0.01 0.03 13.8 0.46
Incl. 499.22 502.02 2.80 0.02 0.01 0.03 19.1 0.67
Incl. 500.17 502.02 1.85 0.02 0.01 0.03 23.8 0.83
And 616.56 625.94 9.38 0.01 0.02 6.6 0.25
Incl. 619.52 623.26 3.74 0.01 0.02 8.5 0.32
Incl. 619.52 620.48 0.96 0.02 0.03 10.8 0.35
And 622.46 623.26 0.80 0.02 0.02 16.3 0.62

 

Note: True thickness of the mineralized intervals in hole 25-3552-47 as a percentage of the down-hole interval, is estimated to be approx. 90-100% for Waulsortian-hosted zones, and 60-80% for sub-Waulsortian zones; ‘-‘ means less than 0.01% (<100 ppm).

Exhibit 5. Summary of Assays from 25-3552-45 at Ballywire

Item From
(m)
To
(m)
Int
(m)
Zn
(%)
Pb
(%)
Zn+Pb
(%)
Ag
(g/t)
25-3552-45 145.37 162.47 17.10 1.75 0.17 1.91 3.0
Incl. 147.14 156.17 9.03 2.58 0.24 2.81 4.3
Incl. 147.14 151.66 4.52 2.66 0.32 2.98 5.9
Incl. 149.00 151.66 2.66 3.12 0.36 3.48 6.9
Incl. 150.73 151.66 0.93 4.79 0.61 5.40 11.6
And 153.41 156.17 2.76 3.38 0.17 3.55 3.5
And 181.49 202.40 20.91 1.41 0.63 2.04 10.0
Incl. 181.49 183.24 1.75 5.94 0.31 6.25 24.1
Incl. 181.49 182.39 0.90 8.69 0.31 9.00 32.9
And 192.27 194.97 2.70 1.50 2.68 4.18 21.6
Incl. 192.27 193.16 0.89 2.13 3.86 5.99 30.3
And 201.52 202.40 0.88 7.03 2.18 9.21 32.5
And 213.38 214.35 0.97 0.12 0.74 0.86 19.4

 

Note: True thickness of the mineralized intervals in hole 25-3552-45 as a percentage of the down-hole interval, is estimated to be approx. 80-100%.

Drilling at Ballywire continues with three rigs. Currently, thirteen (13) new holes are completed or near completed (and in the process of being logged, sampled and assayed). These are shown in Exhibit 2, including: (i) four holes collared approx. 200m E of G11-3552-08; (ii) two holes testing approx. 780m SE of G11-3552-08; (iii) six holes drilled along a drill fence hosting G11-468-01; and (iv) one hole testing approx. 80m SW of G11-3552-12. Note, one additional rig is active at the Company’s Stonepark Project.

Exhibit 6. Regional Gravity Map Showing 6km Long Prospective Trend at Ballywire.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5685/276566_d7aa5ace04d3b85a_005full.jpg

Note: Of the four gravity-high anomalies above, only the ‘C’ anomaly has been systematically drilled to date.

Exhibit 7. Regional Map of Ballywire Discovery and Surrounding Prospects.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5685/276566_groupe.jpg

Notes to Exhibit 7: (a) Pallas Green MRE is owned by Glencore (see Glencore’s Resources and Reserves Report dated December 31, 2024); (b) Stonepark MRE: see the ‘NI 43-101 Independent Report on the Zinc-Lead Exploration Project at Stonepark, County Limerick, Ireland’, by Gordon, Kelly and van Lente, with an effective date of April 26, 2018, as found on SEDAR+; and (c) the historic estimate at Denison was reported by Westland Exploration Limited in ‘Report on Prospecting Licence 464’ by Dermot Hughes dated May, 1988; the historic estimate at Gortdrum was reported in ‘The Geology and Genesis of the Gortdrum Cu-Ag-Hg Orebody’ by G.M. Steed dated 1986; and the historic estimate at Tullacondra was first reported by Munster Base Metals Ltd in ‘Report on Mallow Property’ by David Wilbur, dated December 1973; and later summarized in ‘Cu-Ag Mineralization at Tullacondra, Mallow, Co. Cork’ by Wilbur and Carter in 1986; the above three historic estimates have not been verified as current mineral resources; none of the key assumptions, parameters and methods used to prepare the historic estimates were reported and no resource categories were used; significant data compilation, re-drilling and data verification may be required by a Qualified Person before the historic estimates can be verified and upgraded to be compliant with current NI 43-101 standards; a Qualified Person has not done sufficient work to classify them as a current mineral resource and the Company is not treating the historic estimates as current mineral resources. ‘Rathdowney Trend’ is the south-westerly projection of the Rathdowney Trend, hosting the historic Lisheen and Galmoy mines.

Qualified Person

Technical information in this news release has been approved by Professor Garth Earls, Eur Geol, P.Geo, FSEG, geological consultant at IGS (International Geoscience Services) Limited, and independent ‘Qualified Person’ as defined under Canadian National Instrument 43-101.

Sampling and Analytical Procedures

All core drilled at Ballywire is NQ (47.6mm) and is cut using a rock saw. Sample intervals vary between 0.22m to 1.19m with an average (over 211 samples) of 0.90m. The half-core samples are bagged, labelled and sealed at Group Eleven’s core store facility in Limerick, Ireland. Selected sample bags are examined by the Qualified Person. Transport is via an accredited courier service and/or by Group Eleven staff to ALS Laboratories in Loughrea Co. Galway, Ireland. Sample preparation at the ALS facility comprises fine crushing 70% < 2mm, riffle splitter, pulverise up to 250g 85% < 75um. Analytical procedures are 34 element four acid ICP-AES (codes ME-ICP61 and ME-OG62). Other than paying for a professional analytical service, Group Eleven has no relationship with ALS.

Quality Assurance/Quality Control (QA/QC) Information

Group Eleven inserts certified reference materials (‘CRMs’ or ‘Standards’) as well as blank material, to its sample stream as part of its industry-standard QA/QC programme. The QC results have been reviewed by the Qualified Person, who is satisfied that all the results are within acceptable parameters. The Qualified Person has validated the sampling and chain of custody protocols used by Group Eleven.

About Group Eleven Resources

Group Eleven Resources Corp. (TSXV: ZNG,OTC:GRLVF) (OTCQB: GRLVF) (FSE: 3GE) is drilling the most significant mineral discovery in the Republic of Ireland in over a decade. The Company announced the Ballywire discovery in September 2022, demonstrating high grades of zinc, lead, silver, copper, germanium and locally, antimony. Key intercepts to date include:

  • 10.8m of 10.0% Zn+Pb and 109 g/t Ag (G11-468-03)
  • 10.1m of 8.6% Zn+Pb and 46 g/t Ag (G11-468-06)
  • 10.5m of 14.7% Zn+Pb, 399 g/t Ag and 0.31% Cu (G11-468-12)
  • 11.2m of 8.9% Zn+Pb and 83 g/t Ag (G11-3552-03)
  • 29.6m of 10.6% Zn+Pb, 78 g/t Ag and 0.15% Cu (G11-3552-12) and
  • 11.8m of 11.6% Zn+Pb, 48 g/t Ag (G11-3552-18)
  • 15.6m of 11.6% Zn+Pb, 122 g/t Ag and 0.19% Cu (G11-3552-27)
  • 12.0m of 1.4% Zn+Pb, 560 g/t Ag, 2.30% Cu and 0.17% Sb (25-3552-31), including
  • 6.4m of 2.1% Zn+Pb, 838 g/t Ag, 3.72% Cu and 0.27% Sb (25-3552-31)
  • 39.7m of 9.5% Zn+Pb, 131 g/t Ag and 0.27% Cu (25-3552-35)
  • 25.6m of 9.2% Zn+Pb, 28 g/t Ag (25-3552-39)

Ballywire is located 20km from Company’s 77.64%-owned Stonepark zinc-lead deposit1, which itself is located adjacent to Glencore’s Pallas Green zinc-lead deposit2. The Company’s two largest shareholders are Michael Gentile (14.1% interest) and Glencore Canada Corp. (13.9%). Additional information about the Company is available at www.groupelevenresources.com.

ON BEHALF OF THE BOARD OF DIRECTORS,
Bart Jaworski, P.Geo.
Chief Executive Officer

E: b.jaworski@groupelevenresources.com | T: +353-85-833-2463
E: j.lau@groupelevenresources.com | T: 604-781-4915

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

Technical and scientific information disclosed from neighbouring properties does not necessarily apply to the current project or property being disclosed. This press release contains forward-looking statements within the meaning of applicable securities legislation. Such statements include, without limitation, statements regarding the future results of operations, performance and achievements of the Company, including the timing, content, cost and results of proposed work programs, the discovery and delineation of mineral deposits/resources/ reserves and geological interpretations. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward looking statements as a result of various factors, including, but not limited to, variations in the nature, quality and quantity of any mineral deposits that may be located. All of the Company’s public disclosure filings may be accessed via www.sedarplus.ca and readers are urged to review these materials, including the technical reports filed with respect to the Company’s mineral properties.

1 Stonepark MRE is 5.1 million tonnes of 11.3% Zn+Pb (8.7% Zn and 2.6% Pb), Inferred (Apr-17-2018).
2 Pallas Green MRE is 45.4 million tonnes of 8.4% Zn+Pb (7.2% Zn + 1.2% Pb), Inferred (Glencore, Dec-31-2024).

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/276566

News Provided by Newsfile via QuoteMedia

This post appeared first on investingnews.com

The Eastern Expansion Drill Program Identified Several Mineralized Northwest Structures Hosting Shallow Mineralization Encountered Within a 1.2 Kilometre Trend

EASTERN EXPANSION PROGRAM HIGHLIGHTS:

  • At least three mineralized northwest oriented structures have been identified within the 1.2 kilometre eastern expansion trend running parallel to the Pittsburg-Monarch fault that suggest a series of footwall fault splays as opposed to a singular east-west structure;
  • TXC25-173 cut 0.92 metres of 2,122.7 grams per tonne (g/t) silver equivalent (AgEq) (1,162 g/t silver (Ag) & 8.79 g/t gold (Au)) from 220.9 metres, and a separate zone of 1.04 metres grading 534.8 g/t AgEq (189.8 g/t Ag & 3.16 g/t Au) from 215.5 metres;
  • TXC25-178 drilled 6.4 metres of 296.6 g/t AgEq (135.7 g/t Ag & 1.47 g/t Au), including 0.46 metres of 3,853 g/t AgEq (1,771 g/t Ag & 19.06 g/t Au) from 183.8 metres in a north-south oriented structure within the M&I Conversion Area at DPB South; and

Blackrock Silver Corp. (TSXV: BRC,OTC:BKRRF) (OTCQX: BKRRF) (FSE: AHZ0) (‘Blackrock’ or the ‘Company’) announces the final results from its fully-funded eastern expansion drill program (the ‘Eastern Expansion Program’ or the ‘Program’) at its 100% owned Tonopah West project located in Nye and Esmeralda Counties, Nevada, United States (‘Tonopah West’).

The Eastern Expansion Program was a follow up to the Company’s successful Scout drilling program completed at Tonopah West in February 2025 (see March 31, 2025 news) which shows additional upside for the shallow southern portion of the Denver-Paymaster and Bermuda-Merten vein groups (‘DPB South‘) resource area (the ‘M&I Conversion Area‘) to expand the resource area 1,200 metres in an easterly direction (the ‘Eastern Expansion Zone‘).

The Company commenced the Eastern Expansion Program in July 2025 within the Eastern Expansion Zone, utilizing reverse circulation (RC) drilling with RC pre-collars to establish initial holes, which were then deepened using diamond core drilling (core tails) for more detailed geological analysis. The Program drilled a total of 6,798 metres (22,896 feet) in twenty-four drillholes, however, only 22 drillholes were completed, as two pre-collar holes were not usable for core tails. Of the 22 completed drillholes, three were core holes completed from surface.

Andrew Pollard, Blackrock’s President and CEO, stated, ‘Whereas we set out to target a single east-west mineralized structure, drilling from our Eastern Expansion Program has defined at least three distinct, parallel mineralized zones oriented northwest. These structures appear to be splays off the Pittsburgh-Monarch fault system. Each of these zones has intersected shallow, high-grade, and thick mineralization, indicating significant potential for further expansion in the area. Additionally, drilling in the M&I Conversion Area at DPB South has successfully connected previously isolated intercepts, confirming the presence of north-south trending structures and suggesting additional tonnage potential. Work on our upcoming mineral resource estimate and preliminary economic assessment is now underway and on track for a targeted completion date in February 2026. These will incorporate data from both our Northwest and Eastern Expansion drill programs.’

Table 1 summarizes the final results of the Eastern Expansion Program using a cut-off grade of 150 g/t AgEq.

Table 1: Eastern Expansion Drill Program Significant Results Using a 150 g/t AgEq Cut-off Grade

Drillhole
ID
Program Area Hole
Type
From (m) To (m) Drillhole
Interval
(m)
Ag g/t Au g/t AgEq g/t
TXC25-168 E Expansion DPB South RC/Core 298.03 299.86 1.83 73.7 0.754 156.1
Including 298.03 298.34 0.31 353.0 3.680 754.8
TXC25-171 M&I Conversion DPB South RC/Core 185.99 186.69 0.70 122.0 1.100 242.1
TXC25-171 M&I Conversion DPB South RC/Core 247.19 249.33 2.13 85.7 0.855 179.1
TXC25-173 E Expansion DPB South RC/Core 215.53 216.56 1.04 189.8 3.159 534.8
TXC25-173 E Expansion DPB South RC/Core 220.98 221.90 0.92 1,162.0 8.798 2,122.7
TXC25-178 M&I Conversion DPB South RC/Core 161.54 162.61 1.07 158.5 2.126 390.6
TXC25-178 M&I Conversion DPB South RC/Core 183.80 190.20 6.40 135.7 1.474 296.6
Including 188.37 188.82 0.46 1,771.0 19.067 3,853.0
TXC25-178 M&I Conversion DPB South RC/Core 270.36 271.43 1.07 108.9 1.439 266.0
Including 271.12 271.43 0.31 375.0 4.750 893.7
AgEq = Ag + Au/(Factor); where Factor = (Ag Price/Au Price)*(Ag Recovery/Au Recovery) or Factor=($27/$2,700)*(87%/95%)=0.009157; True thickness is 75% to 85% of drill interval; NSV=No values above cut off; Cut-off grade is 150 gpt AgEq; RC/Core = RC pre-collar with core tail; Core is core from the surface.

 

The Eastern Expansion Program encountered at least three northwest oriented structures which appear to be mineralized and offset the southern caldera margin to the northeast. The structures are parallel to the Pittsburg-Monarch fault and suggest a series of footwall fault splays associated with the main Pittsburg-Monarch fault. Figure 1 below shows the approximate location and orientation of the northwest fault system.

Drilling to date shows shallow, high-grade, and thick zones of mineralization in each of these structures and suggest increased expansion potential along this northwest structural corridor. Historically, the Pittsburg-Monarch fault was considered an ore control within the district with the thickest historically mined veins at Victor and Ohio abutting the main fault. The Company’s drilling in the Eastern Expansion Zone has returned thick vein intervals of gold and silver along the parallel structures confirming the importance of the Pittsburg-Monarch and its footwall fault splays.

Two drillholes, TXC25-171 and TXC25-178, were drilled in the M&I Conversion Area. These drillholes were directed to the west to understand several north-south structures encountered in the previous drilling. The Program was successful in capturing high-grade drill intervals from the north-south structures and shows there are multiple mineralized structures with similar orientation in the area.

Figure 1: Leapfrog model showing northwest oriented structures in the Eastern Expansion area

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/676/276546_9dcdee45e417e956_001full.jpg

Although below the cut-off grade of 150 g/t AgEq, drillholes TXC25-167, -168, -175, -176, -177 and TXC25-179 were mineralized with silver equivalent values ranging between 31 and 133 g/t AgEq. Table 2 shows the range of gold and silver values encountered along the northwest oriented structures.

Table 2: Mineralized Drillholes from the Eastern Expansion program that are below the 150 g/t AgEq cut-off

Drillhole
ID
Program Area Hole
Type
From (m) To (m) Drillhole
Interval
(m)
Ag g/t Au g/t AgEq g/t
TXC25-167 E Expansion Ohio RC/Core 368.96 372.01 3.05 133.0 0.002 133.2
TXC25-169 E Expansion DPB South RC/Core 196.90 199.95 3.05 1.2 0.480 53.6
TXC25-175 E Expansion Ohio RC/Core 277.98 279.69 1.71 14.2 0.155 31.2
TXC25-176 E Expansion Ohio Core 192.51 194.46 1.95 13.9 0.173 32.8
TXC25-177 E Expansion Ohio Core 177.09 178.31 1.22 2.5 0.467 53.5
TXC25-179 E Expansion Ohio Core 235.55 236.46 0.91 23.3 0.270 52.8
TXC25-179 E Expansion Ohio Core 262.28 263.35 1.07 16.9 0.167 35.1
AgEq = Ag + Au/(Factor); where Factor = (Ag Price/Au Price)*(Ag Recovery/Au Recovery) or Factor=($27/$27,00)*(87%/95%)=0.009157; True thickness is 75% to 85% of drill interval; NSV=No values above cut off; Cut-off grade is 150 gpt AgEq; RC/Core = RC pre-collar with core tail; Core is core from the surface.

 

Figure 2: Drillhole location map for the Eastern Expansion drillholes reported in this news release

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/676/276546_9dcdee45e417e956_002full.jpg

Below are all the drillhole intervals above the 150 g/t AgEq cut off from the program showing the upside potential of the Eastern Expansion Zone.

Table 3: Eastern Expansion Program Significant Results Using a 150 g/t AgEq Cut-off Grade (TXC25-156 to TXC25-166 released on October 27, 2025)

Drillhole
ID
Program Area Hole
Type
From (m) To (m) Drillhole Interval
(m)
Ag g/t Au g/t AgEq g/t
TXC25-158 E Expansion DPB South RC/Core 146.30 147.83 1.52 123.0 0.852 216.0
TXC25-158 E Expansion DPB South RC/Core 272.83 273.86 1.04 17.9 2.353 274.8
Including 273.56 273.86 0.30 59.8 7.970 930.1
TXC25-158 E Expansion DPB South RC/Core 340.31 341.13 0.82 56.9 0.671 130.2
TXC25-159 E Expansion DPB South RC/Core 234.18 242.93 8.75 90.3 0.943 193.3
Including 241.65 242.47 0.82 567.7 5.953 1,217.8
TXC25-160 E Expansion DPB South RC/Core 146.30 147.83 1.52 79.4 6.660 806.6
TXC25-164 E Expansion DPB South RC/Core 180.44 186.11 5.67 3.6 2.379 263.4
Including 185.01 186.11 1.10 9.2 8.670 955.9
TXC25-166 E Expansion Ohio RC/Core 160.17 160.78 0.61 114.9 1.658 296.0
TXC25-166 E Expansion Ohio RC/Core 165.20 170.23 5.03 306.8 4.062 750.3
Including 166.73 168.56 1.83 724.1 8.577 1,660.6
TXC25-168 E Expansion DPB South RC/Core 298.03 299.86 1.83 73.7 0.754 156.1
Including 298.03 298.34 0.31 353.0 3.680 754.8
TXC25-171 M&I Conversion DPB South RC/Core 185.99 186.69 0.70 122.0 1.100 242.1
TXC25-171 E Expansion DPB South RC/Core 247.19 249.33 2.13 85.7 0.855 179.1
TXC25-173 E Expansion DPB South RC/Core 215.53 216.56 1.04 189.8 3.159 534.8
TXC25-173 E Expansion DPB South RC/Core 220.98 221.90 0.92 1,162.0 8.798 2,122.7
TXC25-178 M&I Conversion DPB South RC/Core 161.54 162.61 1.07 158.5 2.126 390.6
TXC25-178 M&I Conversion DPB South RC/Core 183.80 190.20 6.40 135.7 1.474 296.6
Including 188.37 188.82 0.46 1,771.0 19.067 3,853.0
TXC25-178 M&I Conversion DPB South RC/Core 270.36 271.43 1.07 108.9 1.439 266.0
Including 271.12 271.43 0.31 375.0 4.750 893.7
AgEq = Ag + Au/(Factor); where Factor = (Ag Price/Au Price)*(Ag Recovery/Au Recovery) or Factor=($27/$2,700)*(87%/95%)=0.009157; True thickness is 75% to 85% of drill interval; NSV=No values above cut off; Cut-off grade is 150 gpt AgEq; RC/Core = RC pre-collar with core tail; Core is core from the surface.

 

Figure 3: Tonopah West expansion potential

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/676/276546_9dcdee45e417e956_003full.jpg

Figure 4: Tonopah West Drillhole Location Coordinates (based on GPS readings in the field, Datum UTM, NAD 1927, Zone 11)

Drillhole ID Area Program Type UTM_NAD27 E UTM_NAD27 N Elevation
(m)
Depth
(ft)
Depth
(m)
Azimuth Dip
TXC25-167 Ohio E Expansion RC/Core 478778.0 4213176.0 1824.5 1302.0 396.8 25 -60
TXC25-168 DPB South E Expansion RC/Core 478600.0 4213250.0 1800.0 1072.0 326.7 180 -65
TXC25-169 DPB South E Expansion RC/Core 478460.0 4213340.0 1800.0 939.0 286.2 180 -65
TXC25-170 Ohio E Expansion RC/Core 478910.0 4213200.0 1835.0 894.0 272.5 230 -70
TXC25-171 DPB South M&I Conversion RC/Core 478105.0 4213222.0 1789.0 1315.0 400.8 270 -50
TXC25-172 Ohio E Expansion RC/Core 478778.0 4213176.0 1824.5 898.5 273.9 225 -65
TXC25-173 DPB South E Expansion RC/Core 478540.0 4213310.0 1800.0 903.0 275.2 180 -75
TXC25-174 Ohio E Expansion RC/Core 479014.0 4213300.0 1822.0 921.0 280.7 40 -70
TXC25-175 Ohio E Expansion RC/Core 479046.0 4213457.0 1820.0 1232.0 375.5 40 -50
TXC25-176 Ohio E Expansion Core 478540.0 4213310.0 1800.0 1060.0 323.1 210 -75
TXC25-177 Ohio E Expansion Core 478495.0 4213405.0 1791.0 732.0 223.1 0 -90
TXC25-178 DPB South M&I Conversion RC/Core 478113.0 4213139.0 1791.0 1728.5 526.8 270 -50
TXC25-179 Ohio E Expansion Core 478460.0 4213340.0 1800.0 922.0 281.0 0 -90

 

Quality Assurance/ Quality Control

All sampling is conducted under the supervision of the Company’s project geologists, and a strict chain of custody from the project to the sample preparation facility is implemented and monitored. The RC samples are hauled from the project site to a secure and fenced facility in Tonopah, Nevada, where they are loaded on to American Assay Laboratory’s (AAL) flat-bed truck and delivered to AAL’s facility in Sparks, Nevada. A sample submittal sheet is delivered to AAL personnel who organize and process the sample intervals pursuant to the Company’s instructions.

The RC samples are lined out at the lab and logged into AAL’s system. The samples are dried, crushed to 85% passing 10 mesh (2mm) and a 250-gram sub-sample split is collected and pulverized to 200 mesh (74 micron) in a ring and puck pulverizer. Then the pulverized material is digested and analyzed for gold using fire assay fusion and an Induced Coupled Plasma (ICP) finish on a 30-gram assay split (FA-PB30-ICP). Silver is determined using five-acid digestion and ICP analysis (ICP-5AM48). Over limits for gold and silver are determined using a gravimetric finish (GRAVAU30 and GRAVAG30). Data verification of the assay and analytical results are completed to ensure accurate and verifiable results. Blackrock personnel insert a blind prep blank, lab blank or a certified reference material approximately every 15th to 20th sample.

Qualified Persons

Blackrock’s exploration activities at Tonopah West are conducted and supervised by Mr. William Howald, Executive Chairman of Blackrock. Mr. William Howald, AIPG Certified Professional Geologist #11041, is a Qualified Person as defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects. He has reviewed and approved the contents of this news release.

About Blackrock Silver Corp.

Backed by gold and silver ounces in the ground, Blackrock is a junior precious metal focused exploration and development company driven to add shareholder value. Anchored by a seasoned Board of Directors, the Company is focused on its 100% controlled Nevada portfolio of properties consisting of low-sulphidation, epithermal gold and silver mineralization located along the established Northern Nevada Rift in north-central Nevada and the Walker Lane trend in western Nevada.

Additional information on Blackrock Silver Corp. can be found on its website at www.blackrocksilver.com and by reviewing its profile on SEDAR at www.sedarplus.ca.

Cautionary Note Regarding Forward-Looking Statements and Information

This news release contains ‘forward-looking statements’ and ‘forward-looking information’ (collectively, ‘forward-looking statements‘) within the meaning of Canadian and United States securities legislation, including the United States Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical fact, are forward-looking statements. Forward-looking statements in this news release relate to, among other things: the Company’s strategic plans; the anticipated objectives and results from the Company’s drill programs at Tonopah West; the timing of completion of an updated mineral resource estimate and preliminary economic assessment on Tonopah West; the Company’s de-risking initiatives at Tonopah West; estimates of mineral resource quantities and qualities; estimates of mineralization from drilling; geological information projected from sampling results; and the potential quantities and grades of the target zones.

These forward-looking statements reflect the Company’s current views with respect to future events and are necessarily based upon a number of assumptions that, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include, among other things: conditions in general economic and financial markets; accuracy of assay results; geological interpretations from drilling results, timing and amount of capital expenditures; performance of available laboratory and other related services; future operating costs; the historical basis for current estimates of potential quantities and grades of target zones; the availability of skilled labour and no labour related disruptions at any of the Company’s operations; no unplanned delays or interruptions in scheduled activities; all necessary permits, licenses and regulatory approvals for operations are received in a timely manner; the ability to secure and maintain title and ownership to properties and the surface rights necessary for operations; and the Company’s ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.

The Company cautions the reader that forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results and developments to differ materially from those expressed or implied by such forward-looking statements contained in this news release and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the timing and content of work programs; results of exploration activities and development of mineral properties; the interpretation and uncertainties of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; project costs overruns or unanticipated costs and expenses; availability of funds; failure to delineate potential quantities and grades of the target zones based on historical data; general market and industry conditions; and those factors identified under the caption ‘Risks Factors’ in the Company’s most recent Annual Information Form.

Forward-looking statements are based on the expectations and opinions of the Company’s management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made. The Company undertakes no obligation to update or revise any forward-looking statements included in this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For Further Information, Contact:

Andrew Pollard
President and Chief Executive Officer
(604) 817-6044
info@blackrocksilver.com

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/276546

News Provided by Newsfile via QuoteMedia

This post appeared first on investingnews.com

PARIS — Airbus fleets were returning toward normal operations on Monday after the European plane maker pushed through abrupt software changes faster than expected, as it wrestled with safety headlines long focused on rival Boeing.

Dozens of airlines from Asia to the United States said they had carried out a snap software retrofit ordered by Airbus, and mandated by global regulators, after a vulnerability to solar flares emerged in a recent mid-air incident on a JetBlue A320.

Airbus said on Monday that the vast majority of around 6,000 of its A320-family fleet affected by the safety alert had been modified, with fewer than 100 jets still requiring work.

JetBlue Airbus A320 planes at LaGuardia Airport in New York City.Nicolas Economou / NurPhoto via Getty Images file

But some require a longer process and Colombia’s Avianca continued to halt bookings for dates until December 8.

Sources familiar with the matter said the unprecedented decision to recall about half the A320-family fleet was taken shortly after the possible but unproven link to a drop in altitude on the JetBlue jet emerged late last week.

Shares in Airbus were down 2.1% in early trading in Paris.

Following talks with regulators, Airbus issued its 8-page alert to hundreds of operators on Friday, effectively ordering a temporary grounding by ordering the repair before next flight.

“The thing hit us about 9 p.m. [Jeddah time] and I was back in here about 9:30. I was actually quite surprised how quickly we got through it: there are always complexities,” said Steven Greenway, CEO of Saudi budget carrier Flyadeal.

The instruction was seen as the broadest emergency recall in the company’s history and raised immediate concerns of travel disruption particularly during the busy U.S. Thanksgiving weekend.

The sweeping warning exposed the fact that Airbus does not have full real-time awareness of which software version is used given reporting lags, industry sources said.

At first airlines struggled to gauge the impact since the blanket alert lacked affected jets’ serial numbers. A Finnair passenger said a flight was delayed on the tarmac for checks.

Over 24 hours, engineers zeroed in on individual jets.

Several airlines revised down estimates of the number of jets impacted and time needed for the work, which Airbus initially pegged at three hours per plane.

“It has come down a lot,” an industry source said on Sunday, referring to the overall number of aircraft affected.

The fix involved reverting to an earlier version of software that handles the nose angle. It involves uploading the previous version via a cable from a device called a data loader, which is carried into the cockpit to prevent cyberattacks.

At least one major airline faced delays because it lacked enough data loaders to handle dozens of jets in such a short time, according to an executive speaking privately.

UK’s easyJet and Wizz Air said on Monday they had completed the updates over the weekend without cancelling any flights.

JetBlue said late Sunday it expected to have completed work to return to service 137 of 150 impacted aircraft by Monday and plans to cancel approximately 20 flights for Monday due to the issue.

Questions remain over a subset of generally older A320-family jets that will need a new computer rather than a mere software reset. The number of those involved has been reduced below initial estimates of 1,000, industry sources said.

Industry executives said the weekend furor highlighted changes in the industry’s playbook since the Boeing 737 MAX crisis, in which the U.S. plane maker was heavily criticized over its handling of fatal crashes blamed on a software design error.

It is the first time Airbus has had to deal with global safety attention on such a scale since that crisis. CEO Guillaume Faury publicly apologized in a deliberate shift of tone for an industry beset by lawsuits and conservative public relations. Boeing has also declared itself more open.

“Is Airbus acting with the Boeing MAX crisis in mind? Absolutely — every company in the aviation sector is,” said Ronn Torossian, chairman of New York-based 5W Public Relations.

“Boeing paid the reputational price for hesitation and opacity. Airbus clearly wants to show … a willingness to say, ‘We could have done better.’ That resonates with regulators, customers, and the flying public.”

This post appeared first on NBC NEWS

Mineralization intersected in 8 of 9 holes at Tahami South, directly adjacent to Aris Mining’s producing operations in the Segovia gold district

Quimbaya Gold Inc. (CSE: QIM,OTC:QIMGF) (OTCQB: QIMGF) (FSE: K05) (‘Quimbaya’ or the ‘Company’) is pleased to announce the discovery of two new mineralized vein systems at its 100%-owned Tahami South Project in the Segovia-Remedios gold district of Antioquia, Colombia.

The Company’s ongoing drill program at Tahami South has successfully identified vein systems that include the previously targeted Vein S and Vein V, confirming the presence of mineralization consistent with quartz vein systems mined regionally. These results confirm the continuation of the Segovia district’s geological architecture onto Quimbaya’s ground, a core thesis of the Company’s strategy.

‘This is a milestone event for Quimbaya. These first vein discoveries validate our thesis and represent a turning point as we move from land assembly into value creation through the drill bit,’ said Alexandre P. Boivin, CEO of Quimbaya Gold. ‘They are not just promising results, they are proof that we’re on to a significant mineralized system, with the grades, geometry, and geology that define Colombia’s most productive gold district.’

Discovery Highlights

  • Several Veins intersected across multiple drill platforms

  • Mineralization intersected in 8 out of 9 drill holes, demonstrating strong structural continuity and robust targeting accuracy in the inaugural Phase 1 program.

  • Drilling remains ongoing, with over 4,000 meters completed to date; the program has been extended beyond its initial scope in response to encouraging early results.

  • Two distinct vein structures system (S & V) discovered, confirming Segovia-style mineral continuity on Quimbaya’s ground.

  • Mineralization comprises quartz, barite, carbonate veining with sulphide assemblage (pyrite, chalcopyrite, galena, sphalerite).

‘These intercepts confirm that we are tapping into the same geological architecture that has made the Segovia district one of the most prolific gold producers in Latin America,’ said Ricardo Sierra, B.Sc., AusIMM, VP Exploration. ‘We see clear continuity in structure, mineralogy, grade, and believe we are only beginning to uncover the full potential at Tahami South.’

While initial assay results have been received from select drill holes, the Company is continuing to await the return of a significant portion of its Phase 1 drill campaign. In the interest of providing a more complete and technically coherent picture of the emerging discovery at Tahami South, Quimbaya intends to release assay data once a critical mass of results has been compiled. This approach ensures a balanced and contextualized interpretation of both grade distribution and structural continuity, and reflects the Company’s commitment to disciplined, data-driven disclosure as the scale of the system comes into focus.

Strategic Implications: Thesis Confirmed

The discovery of vein systems that include the previously targeted Veins S and V represents the first clear technical validation of Quimbaya’s exploration thesis: that district-scale mineralized structures extend beyond known mines into underexplored ground. The Company’s focused land acquisition strategy prioritized claims with gold & silver+ at surface and proximity to producers, and now, early drilling confirms this model is working.

With over 4,000 meters already drilled, surpassing the originally planned Phase 1 total, the Company has extended its current program to follow up on promising early results and to further evaluate vein continuity at depth and along strike. The strong correlation between drill intercepts and the geological model has reinforced Quimbaya’s exploration thesis. These results not only validate the presence of a robust mineralized system but also provide clear vectors for systematic expansion drilling in 2026.

Figure 1. Plan view of Tahami South showing drill platform locations 

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11347/276292_5f253638b40f0884_001full.jpg

Figure 2. System S

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11347/276292_5f253638b40f0884_002full.jpg

Figure 3. System S

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11347/276292_5f253638b40f0884_003full.jpg

Figure 4. System V

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11347/276292_5f253638b40f0884_004full.jpg

Figure 5. System V and S

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11347/276292_5f253638b40f0884_005full.jpg

Capital Strengthened Through Warrant Exercises; Equity Incentives Align Leadership for 2026

Quimbaya Gold is pleased to report that during the second half of 2025, a total of 2,169,164 common shares were issued through the exercise of stock options and warrants, resulting in gross proceeds of C$874,665. This influx of non-dilutive capital reinforces the Company’s treasury ahead of a fully funded 2026 drill campaign.

In parallel, the Company granted an aggregate of 614,034 Restricted Share Units (RSUs) to members of its senior management and board of directors under its equity incentive plan. These RSUs, which will vest in accordance with the plan and CSE policies, reflect Quimbaya’s continued focus on retaining top-tier leadership and aligning long-term performance with shareholder value.

Qualified Person

Ricardo Sierra, AusIMM, is a non-independent Officer ‘VP Exploration’ and the Qualified Person for this news release. Mr. Sierra has sufficient experience with South American exploration projects relevant to the style of mineralization and type of deposit under consideration. He consents to the inclusion of the Exploration Results in the form and context in which they appear.

About Quimbaya

Quimbaya aims to discover gold resources through exploration and acquisition of mining properties in the prolific gold mining districts of Colombia. Managed by an experienced team in the mining sector, Quimbaya is focused on three projects in the regions of Segovia (Tahami Project), Puerto Berrio (Berrio Project), and Abejorral (Maitamac Project), all located in Antioquia Province, Colombia.

Contact Information

Alexandre P. Boivin, President and CEO apboivin@quimbayagold.com

Sebastian Wahl, VP Corporate Development swahl@quimbayagold.com

Quimbaya Gold Inc.
Follow on X @quimbayagoldinc
Follow on LinkedIn @quimbayagold
Follow on YouTube @quimbayagoldinc
Follow on Instagram @quimbayagoldinc
Follow on Facebook @quimbayagoldinc

Cautionary Statements

Certain statements contained in this press release constitute ‘forward-looking information’ as that term is defined in applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein are forward-looking information. Generally, but not always, forward-looking statements and information can be identified by the use of forward-looking terminology such as ‘intends’, ‘expects’ or ‘anticipates’, or variations of such words and phrases or statements that certain actions, events or results ‘may’, ‘could’, ‘should’, ‘would’ or ‘occur’. Forward-looking statements herein include statements and information regarding the Offering’s intended use of proceeds, any exercise of Warrants, the future plans for the Company, including any expectations of growth or market momentum, future expectations for the gold sector generally, the Colombian gold sector more particularly, or how global or local market trends may affect the Company, intended exploration on any of the Company’s properties and any results thereof, the strength of the Company’s mineral property portfolio, the potential discovery and potential size of the discovery of minerals on any property of the Company’s, including Tahami South, the aims and goals of the Company, and other forward-looking information. Forward-looking information by its nature is based on assumptions and involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Quimbaya to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These assumptions include, but are not limited to, that the Company’s exploration and other activities will proceed as expected. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: future planned development and other activities on the Company’s mineral properties; an inability to finance the Company; obtaining required permitting on the Company’s mineral properties in a timely manner; any adverse changes to the planned operations of the Company’s mineral properties; failure by the Company for any reason to undertake expected exploration programs; achieving and maintaining favourable relationships with local communities; mineral exploration results that are poorer or better than expected; prices for gold remaining as expected; currency exchange rates remaining as expected; availability of funds for the Company’s projects; prices for energy inputs, labour, materials, supplies and services (including transportation); no labour-related disruptions; no unplanned delays or interruptions in scheduled construction and production; all necessary permits, licenses and regulatory approvals are received in a timely manner; the Offering proceeds being received as anticipated; all requisite regulatory and stock exchange approvals for the Offering are obtained in a timely fashion; investor participation in the Offering; and the Company’s ability to comply with environmental, health and safety laws. Although Quimbaya’s management believes that the assumptions made and the expectations represented by such information are reasonable, there can be no assurance that the forward-looking information will prove to be accurate. Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. Readers are cautioned not to place undue reliance on forward-looking information as there can be no assurance that the plans, intentions or expectations upon which they are placed will occur. Forward-looking information contained in this news release is expressly qualified by this cautionary statement. The forward-looking information contained in this news release represents the expectations of Quimbaya as of the date of this news release and, accordingly, is subject to change after such date. Except as required by law, Quimbaya does not expect to update forward-looking statements and information continually as conditions change.

NOT FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/276292

News Provided by Newsfile via QuoteMedia

This post appeared first on investingnews.com

Heliostar Metals Ltd. (TSXV: HSTR,OTC:HSTXF) (OTCQX: HSTXF) (FSE: RGG1) (‘Heliostar’ or the ‘Company’) is pleased to announce that Mr James Perry has succeeded the retiring Mr. Jacques Vaillancourt as Chairman at the Company’s Annual General & Special Meeting (‘AGM’) held on November 26th, 2025.

Heliostar’s new Chairman Mr. James Perry commented, ‘I am excited to join Heliostar at this important inflection point. The Company has built a strong foundation through disciplined operations and strategic acquisitions, and I look forward to working closely with the experienced Board and management team as we advance the next phase of growth. Heliostar has the ingredients to become a leading gold producer in the Americas. I will draw on my experience to help steer the Company’s disciplined growth, reinforce strong governance practices, and create lasting value for our shareholders and host communities.’

Charles Funk, President and & CEO, stated – ‘I once again thank our retiring chair for his long service to Heliostar. I strongly welcome James as our new Chairman at a time of considerable growth. Having worked with James previously at Newcrest Mining, I know his ambition for our Company, his growth mindset and the high regard in which he is held across the industry. We are delighted to attract someone of his caliber as we continue advancing toward our goal of becoming a 500,000 ounce per year producer by the end of this decade.’

Mr. Perry is currently President of Sweetwater Royalties, one of the largest landowners in the United States, majority-owned by Orion Resource Partners following its acquisition of Sweetwater’s extensive land and mineral portfolio from Occidental Petroleum in 2020 for approximately US$1.3 billion. Sweetwater’s vast mineral position extends across more than 4.5 million mineral acres in Wyoming, Utah, Colorado, and Michigan, providing an expansive royalty platform spanning industrial minerals, base metals, and renewable-energy opportunities.

Mr. Perry has over 17 years of global mining and resources experience across Asia, Africa, and the Americas, spanning business development, corporate strategy and governance, legal and permitting, ESG, and operations. He spent a decade at Newcrest Mining – one of the world’s largest gold mining companies headquartered in Australia – serving as Business Development Manager and Corporate Counsel. Newcrest was acquired for approximately US$19 billion by Newmont Mining in 2023. Mr. Perry has extensive international experience managing large and complex transactions, including leading Newcrest’s entry into Ecuador and its investment in Lundin Gold’s world-class Fruta del Norte gold district. He possesses broad expertise in project evaluation and negotiation across diverse sectors and jurisdictions. He is a lawyer and holds an M.Sc. in History and International Relations from the London School of Economics.

Incentive plan issuance

Heliostar further announces that, pursuant to the Company’s Omnibus Equity Incentive Compensation Plan, it has granted 250,000 stock options (‘Options’) at an exercise price of $2.63 and 200,000 restricted share units (each, an ‘RSU’) to directors, officers and consultants of the Company. The Options are exercisable for a period of five years and will vest over the next three years. The RSUs will vest in three equal annual instalments commencing on the first anniversary of the grant date.

About Heliostar Metals Ltd.

Heliostar is a gold mining company with production from operating mines in Mexico. This includes the La Colorada Mine in Sonora and the San Agustin Mine in Durango. The Company also has a strong portfolio of development and exploration stage projects in Mexico and the USA. These include the Ana Paula project in Guerrero, the Cerro del Gallo project in Guanajuato, the San Antonio project in Baja Sur, all in Mexico and the Unga project in Alaska, USA.

For Additional Information Please Contact:

Charles Funk
President and Chief Executive Officer
Heliostar Metals Limited
Email: charles.funk@heliostarmetals.com
Phone: +1 844-753-0045
Rob Grey
Investor Relations Manager
Heliostar Metals Limited
Email: rob.grey@heliostarmetals.com
Phone: +1 844-753-0045

 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding Forward-Looking Information

This news release includes certain ‘Forward-Looking Statements’ within the meaning of the United States Private Securities Litigation Reform Act of 1995 and ‘forward-looking information’ under applicable Canadian securities laws. When used in this news release, the words ‘anticipate’, ‘believe’, ‘estimate’, ‘expect’, ‘target’, ‘plan’, ‘forecast’, ‘may’, ‘would’, ‘could’, ‘schedule’ and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things, the Company’s annual production goals.

Forward-looking statements and forward-looking information relating to the terms and completion of the Facility, any future mineral production, liquidity, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management’s experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the receipt of necessary approvals, price of metals; no escalation in the severity of public health crises or ongoing military conflicts; costs of exploration and development; the estimated costs of development of exploration projects; and the Company’s ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect the Company’s respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political, and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or forward-looking information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: precious metals price volatility; risks associated with the conduct of the Company’s mining activities in foreign jurisdictions; regulatory, consent or permitting delays; risks relating to reliance on the Company’s management team and outside contractors; risks regarding exploration and mining activities; the Company’s inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of public health crises; the economic and financial implications of public health crises, ongoing military conflicts and general economic factors to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company’s interactions with surrounding communities; the Company’s ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption ‘Risk Factors’ in the Company’s public disclosure documents. Readers are cautioned against attributing undue certainty to forward-looking statements or forward-looking information. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/276385

News Provided by Newsfile via QuoteMedia

This post appeared first on investingnews.com